Reference Document
|
Description |
Air Force Instruction 63-101, 20 July 2010
|
-
Establishes requirement for an IMS to be maintained by the government PM and contain the supplier's IMS.
- Requires Government PM to perform recurring analysis of contractor schedules.
- Discusses System Engineering detail required in IMS.
|
DCMA Integrated Master Schedule Assessment Guide, Rev 7, 11 Dec 2009
|
- Provides 15 or more mechanical checks on the wellness of an IMS.
- Provides two pages of general guidance for IMS.
- Identifies key checks that will be performed by DCMA during reviews.
|
Defense Acquisition Guidebook, 5 August 2010
|
- Requires Acquisition Strategy to include highlights from IMS.
- Emphasizes that IMS should be event based.
- Requires configuration control of the IMS as part of technical baseline configuration control.
- Requires integration of SEP and IMS.
- Requires WBS as predecessor to IMS development.
- Recommends cross-reference of CTP and TPM in IMS.
|
Defense Acquisition Program Support Methodology, 9 Jan 2009
|
- Stresses early industry involvement in program schedule development.
- Emphasizes risk handling activities be included in IMS.
- Discusses schedule reserve or schedule margin.
- Contains IMS attribute list and IMS relationship to EVMS chart.
- Provides focus questions for IMS evaluation.
|
Depicting Schedule Margin in Integrated Master Schedules, May 2009
|
- NDIA white paper on techniques to depict schedule margin in IMS.
|
DI-MGMT-81650, Integrated Master Schedule, 30 May 2005
|
- The DID required to be placed on EVMS applicable contracts.
- Identifies requirement for performance measurement and SRA.
|
DoD Defense Acquisition Guidebook, 5 May 2010
|
- Emphasizes preparation of WBS prior to IMS development.
- Recommends CTP and TPM be included in IMS.
- Recommends quality activities be included in IMS.
|
DoD Integrated Master Plan and Integrated Master Schedule Preparation and Use Guide, 21 Oct 2005
|
- Provides guidance to government for IMS language in RFP.
- Recommends duplicating the PE, SA, and AC from the IMP into the IMS.
- Contains generic steps for IMS preparation.
- Contains discussion of SRA.
- Contains procedures to evaluate IMS submitted with proposal.
|
DoD Earned Value Management Implementation Guide, October 2006
|
- Contains tailoring guidance for IMS CDRL.
- Recommends contract have procedures and timeline for rolling-wave planning.
- Discusses OTS.
|
GAO Cost Estimating and Assessment Guide, March 2009
|
- Stresses the importance of WBS in IMS development.
- Recommends WBS be outline for IMS.
|
Navy CEVM Analysis Toolkit, Aug 2008
|
- Contains steps for IMS analysis.
- Contains NAVAIR 11 Point Program Schedule Assessment Methodology.
- Contains NAVAIR SRA process.
|
NASA Schedule Management Handbook, January 2010
|
- Recommends schedule management plan for each project.
- Contains best practices for scheduling.
- Lists project documentation needed to build an IMS.
- Contains detailed procedures for resource loaded schedules.
- Contains schedule health metrics.
- Contains Joint Confidence Level techniques.
|
NDIA PMS EVMS Intent Guide, June 2009
|
- Shows attributes of IMS.
- Shows objective evidence of IMS complying with EVMS guidelines.
- Shows the contribution of the IMS to multiple EVMS guidelines.
|
Prime Contractor’s EVMS Description Documents
|
- Addresses preparation of IMS to establish baseline.
- Addresses schedule maintenance.
- Addresses baseline change procedures.
|
Prime Contractor’s Scheduling Guidelines & Handbooks
|
- Contractors often have separate scheduling document to standardize their scheduling practices.
- Contractors may have program unique scheduling instructions where the contract or unusual situations establish more rigorous requirements than in the EVMS Description or contractor scheduling practices.
|
DI-MGMT-81466, Contract Performance Report (CPR), 7 Mar 2005
|
- Identifies format and required content for CPR Formats 1-5 (WBS, OBS, Baseline, Staffing, Explanations and Problem Analyses).
|
| DI-MGMT-81468, Contract Funds Status Report (CFSR), 19 Oct 1995 |
- The DID required to be placed on contracts over 6 months in duration.
- Identifies requirement for supplying funding data about defense contracts to Program Managers.
|
DCMA Interpretive Guide (DIG), August 2008
|
- Provides guidance relative to assessing supplier compliance with the 32 ANSI/EIA-748 EVMS guidelines.
- Breaks down the 32 ANSI/EIA-748 EVMS guidelines into easy to understand language.
- Provides processes by guideline to conduct traces among various EVMS components and documents to verify compliance.
|
OSD (AT&L), DAES Review Trip Wires, 7 Nov 2006
|
- Gives background on DAES Trip Wires Initiative.
- Details trip wire metrics such as BEI, CPLI, SPI, CPI, TCPI, PMB Revisions, and Contract Mods.
|
DAU White Card, April 2008
|
- Tip sheet containing a NDIA/ANSI guideline matrix relating them to the organizing, scheduling, work / budget authorization, accounting, indirect management, managerial analysis, change incorporation, material management, and subcontract management processes.
|
NAVAIR IMS Guidebook, February 2010
|
- Discusses basic IMS principles, IMS planning, building and managing to an IMS, best practices, metrics, IMS-related training, and contract considerations.
- Contains an IMS FAQ.
|